Answer first
Answer first: what BKI requires of your vessel and which yards satisfy it
If your vessel is BKI-classed, its maintenance calendar is written by the survey cycle, not by preference.
If your vessel is BKI-classed, its maintenance calendar is written by the survey cycle, not by preference. Certificates stay valid only while surveys are passed on time, and insurers, charterers and port state control all read class status before they read anything else. The practical questions an owner needs answered are: when is each survey due, what will the surveyor require, which yard can host the survey properly, and what work should be packaged into the same docking to avoid paying for the dock twice. Those four questions are this page — and the desk's service.
BKI publishes its rules and survey requirements publicly (rules for classification and surveys, available via BKI's official publications); what follows summarises standing practice for planning purposes. Your vessel's survey status report remains the authoritative document, and we always work from it.
Survey cycle
BKI survey cycle map (annual, intermediate, special, docking)
| Survey | Timing | Where held | Planning note |
|---|---|---|---|
| Annual survey | Every 12 months (±3-month window) | Afloat, at berth or anchorage | Keep certificates, records and safety equipment audit-ready |
| Intermediate survey | Between 2nd and 3rd anniversary | Afloat; may extend scope by age | Older vessels face enhanced tank and thickness checks |
| Special survey (class renewal) | Every 5 years | Normally aligned with a docking | Thickness gauging and steel renewal decisions land here |
| Docking survey | Twice per 5-year cycle, max 36 months apart | Dry dock / slipway | One docking usually pairs with the special survey |
Swipe the table sideways for every column
The economics are in the pairing: a docking survey that also clears the special survey, coating renewal and steel work in one dock period costs materially less than the same items scattered across separate dockings. That pairing is a scheduling exercise — and it starts a year out, not a month out.
Checking whether a yard is BKI-approved
Class-relevant work — steel renewal, welding on hull structure, machinery affecting class items — must be executed under conditions the attending surveyor accepts: qualified welders, approved procedures, traceable materials, and calibrated testing. Yards accustomed to BKI work maintain welder qualifications and current procedure approvals as standing practice; occasional yards do not, and the difference surfaces mid-survey as rejected work. Before committing a survey docking we verify with the yard and the local BKI office that the specific scope can be witnessed at that facility — a ten-minute check that prevents a multi-week problem.
Docking survey preparation: gaugings, checklists, surveyor liaison
A docking survey passed first time is prepared, not hoped for. Our preparation sequence: thickness gauging by an approved firm before or at docking, with the report structured the way surveyors read it; tanks and voids opened, cleaned and ventilated to schedule; sea valves, shafting, rudder and anchors staged for inspection in the order the surveyor will walk; and previous conditions of class closed out with evidence ready. We liaise with the attending surveyor on sequence and timing so the survey follows the work, and lay days are never burned waiting for attendance.
Class renewal support for commercial fleets
For fleets, class is a portfolio problem: multiple vessels, staggered cycles, and yard slots that must line up with trading commitments. The desk maintains a fleet survey calendar, books dockings against due windows across the register, packages survey scope with commercial repair to cut dock days, and supervises execution so renewal is granted without conditions where the steel allows it.
Documents to keep survey-ready at all times
Surveys go fastest for vessels whose paperwork is already in survey order: the current class certificates and survey status report, previous docking and gauging reports, records of steel renewals with material certificates, coating specifications and DFT records from the last docking, and evidence closing any previous conditions of class. We build and maintain this file for fleet clients so every attendance — planned or unplanned — starts from documents, not from searching.
- Current class certificates and survey status report
- Previous docking and gauging reports
- Records of steel renewals with material certificates
- Coating specifications and DFT records from the last docking
- Evidence closing any previous conditions of class
Questions
Frequently asked questions
How do I check if a shipyard in Indonesia is BKI approved?
What are BKI class renewal survey requirements for seagoing ships?
Apa saja persyaratan kapal naik dok menurut BKI?
What does BKI require for a wooden charter vessel survey?
Is BKI recognised internationally for flag administrations?
Explore the Register
Put your survey dates in front of us
Quotations coordinated in USD; official BKI and government fees may be quoted in IDR.
Quotations in USD · government and port fees may be quoted in IDR