Skip to content
Monitored across extended hours, Europe to Australia EN · Bahasa Indonesia
Indonesia Shipyard — The National Yard Register
Shipwright at a workbench inside a timber boatyard workshop

Selection protocol

Shipyard Selection & Vetting, Lintas-Indonesia

The difference between a good Indonesian yard and an expensive one rarely shows in the quotation — it shows in dock certificates, welder qualifications, coating facilities and how the yard priced its last three remeasures. Our vetting protocol audits exactly those items, in person, before you commit a vessel, and returns a defensible shortlist with normalised USD tender comparisons.

10 days

Shortlist incl. yard visits

3

References checked

In person

Every recommendation

USD

Normalised tenders

Answer first

Answer first: the vetting checklist that separates a good Indonesian yard from an expensive one

A yard that answers the screening questions quickly and documentarily is usually a yard you can work with; a yard that answers with hospitality is usually not.

Is the dock or slipway certificate current, and what did the last load test show?
Are welder qualifications and procedure approvals live, and for which processes?
Does the yard own covered blasting and coating capability, or subcontract it?
What do the last three comparable projects say about remeasure behaviour and schedule discipline?

Every owner has heard a version of the same story: the lowest quote won, the invoice arrived 40% higher, and the coating failed within the year. None of that is bad luck — it is unvetted procurement. The screening questions that predict outcomes: Is the dock or slipway certificate current, and what did the last load test show? Are welder qualifications and procedure approvals live, and for which processes? Does the yard own a covered blasting and coating capability, or subcontract it to whoever is free? What do the last three comparable projects say about remeasure behaviour and schedule discipline? A yard that answers these quickly and documentarily is usually a yard you can work with; a yard that answers with hospitality is usually not.

The protocol

Our vetting protocol

Capability & capacity verification against the Register

We start from the National Yard Register and verify the specific facility against your vessel: dock geometry and certified lift versus your docking plan, crane reach over your working areas, shop capacity for the dominant package, and real slot availability — not brochure availability.

Class standing & certification check

Current dock certificates, welder and NDT qualifications, procedure approvals, and the yard's working relationship with the class society that will attend your survey. Where BKI attendance is needed, we confirm with the local class office that the scope can be witnessed at that facility.

HSE and coating-facility audit

Coating performance is decided by facilities and climate discipline: covered or shielded blasting capability, compressed-air quality, dehumidification where the specification demands it, DFT instrumentation with calibration records. HSE culture is audited on the floor — scaffolding standards, hot-work control, confined-space practice — because yards that manage safety poorly manage everything else the same way.

Reference & track-record verification

We speak to owners who docked comparable vessels at the yard within the last two years, and we ask the uncomfortable questions: final invoice versus quotation, growth-work pricing behaviour, schedule adherence, defect response after redelivery. Reference checks are the lowest-cost intelligence in the entire process and almost nobody does them properly.

Tender comparison: normalising quotes across yards

Indonesian yard quotations do not arrive in a comparable format — inclusions, units and assumptions differ line by line. We rebuild each tender into a common USD structure: dock dues and lay days; per-GT standard services; steel at rate × estimated quantity with the remeasure rule stated; coatings at area × specified system; machinery packages itemised; and every exclusion listed explicitly. Only then does "lowest bid" mean anything. The normalised sheet regularly reverses the apparent ranking — the low headline number is often the highest structural price once exclusions and remeasure exposure are priced in.

  • Dock dues and lay days
  • Per-GT standard services
  • Steel at rate × estimated quantity, with the remeasure rule stated
  • Coatings at area × specified system
  • Machinery packages itemised
  • Every exclusion listed explicitly

Fleet framework agreements for repeat docking

Fleets docking multiple vessels a year should not tender from zero each time. We negotiate framework terms with two or three vetted yards: standing rates for tariff items and steel, agreed remeasure and growth-work protocols, slot priority windows, and performance review against each docking’s records. The framework keeps competitive tension — the yards know the fleet has alternatives — while cutting procurement time per docking from weeks to days.

Engage the desk: scope form + WhatsApp

Send vessel particulars (LOA, beam, draft, GT), class status and next survey dates, the intended work scope, and your target window. We return a vetted shortlist with normalised comparisons and a recommendation with reasons — typically inside ten working days including yard visits. Vetting can also be commissioned standalone on a yard you have already chosen, as a pre-contract audit.

WhatsApp the desk: +62 811-3941-4563 · bd@juaraholding.com. Fees and quotations coordinated in USD.

What a vetting report contains

Every vetting engagement closes with a written report the owner keeps: facility audit findings with photographs, certificate and qualification verification results, reference-check summaries with the questions asked and answers given, the normalised tender comparison where quotes were in play, and a ranked recommendation with the reasoning stated plainly enough to defend to a board, an insurer or a co-owner. The report is the product — a decision you can show your stakeholders, not an opinion you have to ask them to trust.

Questions

Frequently asked questions

What is the checklist for vetting and selecting a shipyard in Indonesia?
Verify in order: dock/slipway certificates and load tests; welder and procedure qualifications; blasting and coating facilities with calibrated DFT instruments; class relationship for your survey; recent comparable references including final-invoice behaviour; and slot reality against your window. Documents first, hospitality never.
What certifications should an Indonesian shipyard have?
Current dock or slipway certification with load-test records, live welder qualifications and welding procedure approvals for your hull material, NDT capability with qualified operators, and — where your survey requires it — standing acceptance from the attending class society. Quality-system certification is a plus; floor-level evidence matters more.
How do you compare dry docking tenders from different yards?
By rebuilding every quote into one USD structure — dues, per-GT tariff items, steel rates with remeasure rules, coating systems by area, itemised packages, explicit exclusions — then pricing the risk in each yard's assumptions. The normalised sheet frequently reverses the headline ranking.
Bagaimana cara memilih galangan kapal yang tepat untuk docking armada?
Mulai dari kecocokan geometri dok dan sertifikat angkat, lalu audit kualifikasi juru las, fasilitas blasting-coating, hubungan dengan kelas, dan rekam jejak invoice akhir pada proyek sejenis. Untuk armada, kontrak kerangka dengan dua-tiga galangan tervetting memangkas waktu procurement setiap docking. Panduan bahasa Indonesia: galangan kapal Indonesia.
Do you inspect yards in person before shortlisting?
Yes. Every shortlist that carries our recommendation includes a physical audit of the specific facility — dock, shops, coating capability, HSE practice — conducted for that engagement. Register data and phone calls screen; only site presence vets.

Commission a vetting, or a full shortlist

Send vessel particulars, class status and next survey dates, the intended work scope and your target window. A vetted shortlist with normalised comparisons comes back inside roughly ten working days, including yard visits.

WhatsApp the Desk Email the Desk Ship repair desk